Keyfix Logo Request CPD

Tustin Estate

Southwark, London

Tustin Estate

Southwark, London

Tustin Estate

Southwark, London

  • Home
  • Tustin Estate Regeneration

Tustin Estate Regeneration

Keyfix supplied 3,975m of NCCT, including 887 Pre-Formed Corners and Stainless Steel Weeps.

Forming part of Southwark Council’s Great Estates programme, the major development project would see the design and construction of 690 new build homes, with 355 properties for social rent, 98 for key workers, 17 for returning leaseholders and 220 homes for market rent to help subsidise the development.

Alongside the stylish and functional new residences, the Tustin Estate redevelopment involved the construction of new ground-floor commercial space and an upgraded park and extensive landscaping.

Having worked with the company and its sister brands in the past, the brickwork contractor – City Brickwork (UK) Ltd – was well aware of the incredible benefits provided by Keyfix’s NCCTs, Weeps and Pre-formed Corner Units.

To enhance fire protection and future-proof the building effectively, Keyfix supplied 3,975m of NCCT, including 887 Pre-Formed Corners and Stainless Steel Weeps. Without the need for sealants, tapes or mastics, Keyfix’s innovative products provided continuous cavity drainage and fire-safe performance across the entire façade.

Indeed, the classified Class A1 Non-combustible Grade 304 austenitic stainless steel cavity trays offer trusted and rigid self-support, are designed to exceed the lifespan of the building and prevent the risk of thermal bridging.

Project Details

Main Contractor

Bouygues UK

Brickwork Contractor

City Brickwork

Architect

De Rijke March Morgan Architects

Our Products

Keyfix Product Guide

For more information about the Keyfix range download the Product Guide.

Download Keyfix Product Guide

Technical Support

For technical support contact the support team today.

Contact Us

Customer Testimonials

“Having the NCCTs and other products all manufactured and formed away from the site really expedited the installation and cut down time considerably. “Keyfix was always on hand to offer advice and guidance and any queries we had were dealt with very promptly.”

Neil Hatsell, Director at City Brickwork, highlighted the importance of having the products manufactured and formed off-site. He said:

Related Projects

Bendigo

Keyfix supplied 2,982m of NCCT, including 1,440 Pre-Formed Corners and Stainless Steel Weeps, providing continuous cavity drainage and fire-safe performance across the façade.

NCCT
NCW
Find out more

Related Projects

Crown Trading Centre

Keyfix supplied 5,599m of NCCT, including 1,576 Pre-Formed Corners, Stainless Steel Weeps and 1,800 Non-Combustible Cavity Tray Lintels, ensuring continuous cavity drainage and fire-safe performance across the façade.

NCCT
NCCTL
NCW
Find out more

Related Projects

The Arc, 225 City Road

Keyfix supplied 3,000m of NCCTs with Pre-Formed Corners and Stainless Steel Weeps, delivering A1 fire compliance and supporting The Arc London’s complex façade design.

NCCT
NCW
Find out more

Request Free CPD Presentation

Discover our latest CPD “Solving the non-combustible Challenge with Keyfix Cavity Tray systems”

Request CPD

Keep up to date with Keyfix

Enter your name and email address below to keep up to date with Keyfix product developments, CPDs, industry news and much more.