The Keyfix NCCT was specified due to its ‘one-piece system’ which allows for a very simple and efficient installation. The system is self-supporting as it doesn’t require fixing back to the internal frame, therefore saving valuable time. Additionally, the adjustability of the perp joint allows for the cavity trays to be shunted to match the brick coursing on site, ensuring consistency in the brickwork formation.
The NCCT was also chosen due to its A1 fire rating. It is made from non-combustible Grade 304 stainless steel which will never contribute to fire loading in the building. This fully compliant system ensures that the Park East buildings will be future-proofed against the implementation of tighter regulations.
The non-combustible nature of the product makes it an effective solution to provide DPC protection over lintels, masonry supports, soffit systems and other elements in the cavity such as fire barriers. Additionally, the fact that the Keyfix NCCT does not rely on tape or mastics to form its watertight joints negates the prevalent cause of product failure and creates a more robust system altogether.
In addition to providing NCCTs, Keyfix identified where it could offer technical support, and provided a full technical review of architects drawings, a comprehensive mark-up, and a scheduled breakdown of component location. The team also attended design meetings to ensure that the products were being used correctly, as well as hosting a Tool Box Talk prior to the first install to ensure the system was installed properly.