Keyfix Logo Request CPD

Verdo-Kew Bridge

Brentford, London

Verdo-Kew Bridge

Brentford, London

Verdo-Kew Bridge

Brentford, London

  • Home
  • Verdo-Kew Bridge

Verdo-Kew Bridge

The speed of installation and improved build quality of the Keyfix Non-Combustible Cavity Tray System has played an important part in the construction of a major new high-rise residential development in West London and at the same time help meet and exceed regulatory requirements.

Located close to the Thames in Brentford West London, Verdo – Kew Bridge is a new mixed use development which forms part of a major new regeneration scheme that includes the new community stadium for Brentford FC. Designed by Broadway Malyan and built by developer EcoWorld, it comprises of 487 new one, two and three-bed homes alongside retail and business spaces, public green spaces and community areas.

In order to safeguard the future of the development, Keyfix supplied 765 metres of Keyfix Non-Combustible Cavity Trays (NCCT) along with 2490 Corner Units, 4000 Pier Units and 5000 Weeps on blocks E,F,G and H of the development.

Project Details

Architect

Broadway Malyan

Developer

EcoWorld

Main Contractor

EcoWorld

Brickwork Contractor

DWG Brickwork

Our Products

Keyfix Product Guide

For more information about the Keyfix range download the product guide.

Download Keyfix Product Guide

Technical Support

For technical support contact the support team today.

Contact Us
Chobham Manor, Stratford, London

Related Projects

Chobham Manor

The Keyfix Non-Combustible Cavity Tray System has played an important role in futureproofing a major new residential development in Stratford’s Olympic Park by exceeding new building regulations whilst improving build quality and installation efficiency on site.

NCCT
Find out more

Related Projects

Capitol House

The Keyfix Non-Combustible Cavity Tray System has played an integral role in the construction of a new residential development in north London by exceeding building regulations and increasing installation efficiency on-site.

NCCT
Find out more

Related Projects

Shuttleworth Road

The Keyfix Non-Combustible Cavity Tray System has proven integral to the construction of a new high-rise residential development in South West London, by improving installation efficiency and quality on site, and exceeding building regulations.

NCCT
Find out more

Related Projects

Southmere Phase 1b

Keyfix’s Non-combustible Cavity Tray has provided the effective solution to the government mandate for cavity trays with limited combustibility on a major south east London housing development.

NCCT
NCW
Find out more

Request Free CPD Presentation

Discover our latest CPD “Solving the non-combustible Challenge with Keyfix Cavity Tray systems”

Request CPD

Keep up to date with Keyfix

Enter your name and email address below to keep up to date with Keyfix product developments, CPDs, industry news and much more.