Keyfix Logo Request CPD

Ashley Road West

Tottenham Hale, London

Ashley Road West

Tottenham Hale, London

Ashley Road West

Tottenham Hale, London

  • Home
  • Ashley Road West

Ashley Road West

The Keyfix Non-Combustible Cavity Tray has been installed as part of a new residential development in the London Borough of Haringey, Ashley Road West. The innovative system has helped to improve efficiency onsite and to future-proof the building against fire safety regulations.

Developed by Related Argent, Ashley Road West is a new build residential development in the heart of trendy Tottenham Hale, located alongside the newly established central square with a vibrant offering of shops, restaurants and bars. The building comprises a limited collection of 54 apartments in a modern open-plan design based upon high-quality specification. The building also provides ample opportunity for ambient living as each apartment includes a private balcony, and all residents can enjoy the tranquil fifth-floor rooftop garden. The development is well-placed next to the brand new £30m Tottenham Hale station offering direct links to the City, the West End and London Stansted Airport via Victoria and National Rail lines.

Working in partnership with Pollard Thomas Edwards Architects, main contractor Galliford Try, and brickwork contractor Grangewood Brickwork, manufacturer Keyfix supplied 1,730m of its Non-Combustible Cavity Tray (NCCT), 492 Corner Units, 4,830 of Weeps and 546 Stepped Capping Pieces to this development.

The client specified the Keyfix NCCT as it was the most robust system on the market which also offered excellent value for money. Significantly, the Ashley Road West development featured a complex brickwork design whose assembly could be made more efficient using the Keyfix Non-Combustible Cavity Tray system.

Project Details

Developer

Argent Related

Architect

Pollard Thomas Edwards

Main Contractor

Galliford Try

Brickwork Contractor

Grangewood Brickwork

Our Products

Keyfix Product Guide

For more information about the Keyfix range download the Product Guide.

Download Keyfix Product Guide

Technical Support

For technical support contact the support team today.

Contact Us

Related Projects

Ashley Road East

The Keyfix Non-Combustible Cavity Tray System has played a vital role in the building of Ashley Road East, a major new residential development in Tottenham Hale, by improving installation efficiency and quality on site, and exceeding building regulations.

NCCT
Find out more
Addiscombe Oaks

Related Projects

Addiscombe Oaks

The Keyfix Non-Combustible Cavity Tray has been installed as part of a new-build project, Addiscombe Oaks in South London, helping to safeguard the development from fire and future building regulation changes.

NCCT
Find out more

Related Projects

Capitol House

The Keyfix Non-Combustible Cavity Tray System has played an integral role in the construction of a new residential development in north London by exceeding building regulations and increasing installation efficiency on-site.

NCCT
Find out more
Chobham Manor, Stratford, London

Related Projects

Chobham Manor

The Keyfix Non-Combustible Cavity Tray System has played an important role in futureproofing a major new residential development in Stratford’s Olympic Park by exceeding new building regulations whilst improving build quality and installation efficiency on site.

NCCT
Find out more

Related Projects

Gallions Place

The Keyfix Non-Combustible Cavity Tray System has played an essential role in the construction of a new mixed-use development in East London, by exceeding building regulations and increasing installation efficiency on-site.

NCCT
NCCTL
NCW
Find out more
Park East building

Related Projects

Park East

The Keyfix Non-Combustible Cavity Tray has been installed as part of a major housing project , Park East in South East London, helping to improve efficiency onsite, and to exceed building regulations.

NCCT
Find out more

Related Projects

Shuttleworth Road

The Keyfix Non-Combustible Cavity Tray System has proven integral to the construction of a new high-rise residential development in South West London, by improving installation efficiency and quality on site, and exceeding building regulations.

NCCT
Find out more

Related Projects

Verdo-Kew Bridge

The speed of installation and improved build quality of the Keyfix Non-Combustible Cavity Tray System has played an important part in the construction of a major new high-rise residential development in West London and at the same time help meet and exceed regulatory requirements.

NCCT
Find out more

Related Projects

Southmere Phase 1b

Keyfix’s Non-combustible Cavity Tray has provided the effective solution to the government mandate for cavity trays with limited combustibility on a major south east London housing development.

NCCT
NCW
Find out more

Related Projects

Victoria Central

The Keyfix Non-Combustible Cavity Tray has been installed as part of a new residential development in Southend-on-Sea, Essex, offering value for money, ease of construction, and best practice on this project.

NCCT
NCCTL
Find out more

Discuss Your Project

We invite you to make contact with our technical design team to collaborate or enquire about a project.

Contact Us

Request Free CPD Presentation

Discover our latest CPD “Solving the non-combustible Challenge with Keyfix Cavity Tray systems”

Request CPD

Keep up to date with Keyfix

Enter your name and email address below to keep up to date with Keyfix product developments, CPDs, industry news and much more.