Ashley Road West
Tottenham Hale, London
The Keyfix Non-Combustible Cavity Tray has been installed as part of a new residential development in the London Borough of Haringey, Ashley Road West. The innovative system has helped to improve efficiency onsite and to future-proof the building against fire safety regulations.
Developer
Argent Related
Architect
Pollard Thomas Edwards
Main Contractor
Galliford Try
Brickwork Contractor
Grangewood Brickwork
For more information about the Keyfix range download the Product Guide.
Download Keyfix Product GuideWe invite you to make contact with our technical design team to collaborate or enquire about a project.
Contact UsDiscover our latest CPD “Solving the non-combustible Challenge with Keyfix Cavity Tray systems”
Request CPDEnter your name and email address below to keep up to date with Keyfix product developments, CPDs, industry news and much more.